An exergoeconomic analysis of a land-based photovoltaic system for all provinces in Turkey

Küçük Resim Yok

Tarih

2023

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Inderscience Enterprises Ltd

Erişim Hakkı

info:eu-repo/semantics/closedAccess

Özet

In this study, an exergoeconomic analysis was conducted for a grid-connected photovoltaic system with a nominal power of 1,166 kWp to be installed in all provinces of Turkey. First, energy input, exergy input and electricity generation of the system were calculated depending on the hourly climatic condition of each province. Next, annual energy and exergy efficiencies of the system were determined. Last, unit electricity generation costs were obtained with exergoeconomic analysis by using SPECO method. All annual results were presented in maps. The minimum electricity generation cost was determined as 31 USD/MWh in Nigde, while maximum electricity generation cost was in Giresun as 54 USD/MWh. The maximum energy and exergy efficiencies were determined as 17.4%-18.7% in Kars, as one of the coldest provinces; the lowest energy and exergy efficiencies were determined as 16.4%-17.6% in Sanliurfa, as one of the warmest provinces, respectively.

Açıklama

Anahtar Kelimeler

Solar Energy, Photovoltaic System, Energy And Exergy Efficiencies, Exergoeconomic Analysis, Electricity Generation Cost, Mapping, Turkey

Kaynak

International Journal Of Exergy

WoS Q Değeri

Scopus Q Değeri

Q3

Cilt

42

Sayı

3

Künye