Yazar "Ertunc, Ela" seçeneğine göre listele
Listeleniyor 1 - 4 / 4
Sayfa Başına Sonuç
Sıralama seçenekleri
Öğe Comparison of different optimization based land reallocation models(Elsevier Sci Ltd, 2020) Uyan, Mevlut; Tongur, Vahit; Ertunc, ElaLand reallocation, which is an optimization problem in the field of engineering, is the process of reallocating parcels to pre-determined blocks according to the preferences of landowners. In practice, this is done manually and takes weeks or even months. The elongation of this process affects both the cost of the project and the project's acceptability by the landowners and thus the success of the project. Because the success of land consolidation projects is determined by the satisfaction of the landowners. For these reasons, the optimization-based land reallocation studies have been extensively carried out recently. However, these methods in the literature are not used in practice and the reallocation is still done manually. Therefore, for the first time in this study, two new reallocation models were developed to solve this problem by using Migration Birds and Simulated Annealing Algorithms and the results of these methods in a real project area were compared. Additionally, the results were compared to the conventional reallocation method (manual reallocation) to evaluate the performance of the methods developed. Both proposed methods provided a successful and practicable reallocation plan in a very short time with respect to the conventional one.Öğe Land reallocation model with simulated annealing algorithm(Taylor & Francis Ltd, 2021) Ertunc, Ela; Uyan, Mevlut; Tongur, VahitLand consolidation project has many stages. Land reallocation is the most considerable stage in which many factors play a role and forms the basis of this project. In this study, a new optimisation-based reallocation model has been developed to realise block reallocation by evaluating the requests of landowners. The reallocation according to the developed method also reset the block spaces automatically. The most powerful aspect of the method is that while the reallocation phase in land consolidation projects takes weeks and months, this method can be done in minutes. This method contributes to projects in terms of time and cost.Öğe Modeling of reallocation in land consolidation with a hybrid method(Elsevier Sci Ltd, 2018) Ertunc, Ela; Cay, Tayfun; Hakli, HuseyinLand consolidation is one of the important tool of increasing productivity in agricultural production. Land consolidation not only consolidates fragmented land, but also improves the standards of landowners in agriculture, technical, social and cultural areas. Land consolidation projects consist of various stages. The most important, complicated and time-consuming part of these stages is land reallocation. Land reallocation is a process which requires a long time and high operating costs and in which there frequently arise disputes between landowners. For these reasons, it is inevitable to use computer technology to optimize this process. In this study, a hybrid method including genetic algorithm and fuzzy logic techniques which enable reallocation to be done automatically in land consolidation has been used. The crossover rate and the operation of the genetic algorithm (GA) method have been realized as a self-adaptive structure using fuzzy logic techniques A similar study used for the land reallocation problem in the literature, the results of reallocation plans obtained by the technician and the results obtained by the hybrid method have been compared. When the experimental results are evaluated, it has been found that the hybrid method used is more successful and efficient than similar studies in the literature and also has a better reallocation plan.Öğe Use of the Migrating Birds Optimization (MBO) Algorithm in solving land distribution problem(Elsevier Sci Ltd, 2020) Tongur, Vahit; Ertunc, Ela; Uyan, MevlutLand distribution is an important process in Land Consolidation (LC) projects where agricultural parcels are reallocated to predetermined blocks. Land distribution is a process that takes a long time, requires high operating costs, and conflicts between landowners occur frequently. The parcels are tried to be placed in the best and most appropriate place of the existing blocks by considering many parameters in the distribution stage. Therefore, the placement of new parcels in blocks is seen as an optimization process. In LC projects, this process is carried out manually by technical staff using a software and thus it becomes a process that takes weeks and even months. Various methods have been developed to solve this important stage of the LC projects. It is required to find the best solution, since this issue is an optimization problem. This study aims to develop a new land distribution method. For this purpose, land distribution were carried out by use Migrating Birds Optimization (MBO) Algorithm. Used land distribution method in practice and the results of the new developed method were compared and thus the usability of the method that developed by us was tested. With this study, it has developed a new and successful distribution method according to the preference of land owners.