Direk tipi trafo tesisleri için tip proje uygulamalarının geliştirilmesi

dc.authoridDanışman: 0000-0001-5277-6650en_US
dc.authorid0000-0002-6127-6524en_US
dc.contributor.advisorÖzcan, Muciz
dc.contributor.authorKüçüksümbül, İbrahim
dc.date.accessioned2021-03-01T07:35:52Z
dc.date.available2021-03-01T07:35:52Z
dc.date.issued2020en_US
dc.departmentNEÜ, Fen Bilimleri Enstitüsü, Elektrik-Elektronik Mühendisliği Anabilim Dalıen_US
dc.descriptionYüksek Lisans Tezien_US
dc.description.abstractHer geçen gün artan enerji ihtiyacı, elektrik şebekelerinin yükünü ve büyüklüğünü arttırmaktadır. Elektrik şebekelerinde istenmeyen durumların başında gelen elektrik arızaları sebebiyle tedarik şirketleri ve tüketiciler, maddi manevi zararlarla karşı karşıya kalmaktadır. Enerji taleplerini karşılamak için dağıtım hatlarına trafolar eklenmektedir. 400 kVA'ya kadar direk tipi olarak tesis edilebilen dağıtım trafoları özellikle yüksek güçte tüketim yapan tüketiciler tarafından ve AG abonelerinin ihtiyacını karşılamak için tedarik şirketi tarafından tesis edilmektedir. Direk tipi trafo tesislerinin tip projeleri TEDAŞ tarafından belirlenmektedir ve tesis sahada tip projesine uygun olarak yapılmak zorundadır. Bu çalışmada direk tipi trafo tesislerinin tip projesinde revize çalışması yapılarak parafudr kaynaklı OG arızaların şebekeye olumsuz etkilerinin önlenmesi araştırılmıştır. Öncelikle tesiste kullanılan ekipmanların teknik bilgileri edinilerek ilgili yönetmelik ve mevzuatlara uygunlukları incelenmiştir. Çalışma bölgesi olarak direk tipi trafolu tesislerin sayısı 2018 yılında 1952 adet, 2019 yılında 2187 adet olarak kaydedilen Konya ili Ereğli ilçesi seçilmiştir. Bu tesislerde meydana gelen kalıcı OG arıza sayılarının 2018 yılında %10'unu, 2019 yılında ise %13'ünü parafudr arızalarının oluşturduğu tespit edilmiştir. Direk tipi trafolu tesis sayısı artışı ile parafudr kaynaklı arıza sayısının artışı ilişkilendirilerek aktarılmıştır. Parafudr arızalarından kaynaklanan tahakkuk kaybı ve onarım maliyetleri birim fiyatlar üzerinden işlenerek çalışma içerisinde sunulmuştur. Çalışılan şebekede dpPower ve PSS Sincal programları ile modelleme yapılmıştır. Bu modellemede kısa devre analizine, şebeke topolojosine ve simülasyonuna yer verilmiştir. Kısa devre analizi yapılarak arıza senaryolarında meydana gelen kısa devre akımlarının büyüklükleri ile hangi noktalarda arıza akımının daha yüksek olduğu simülasyon sonuçları ile eklenmiştir. Bölgesel veriler ve teknik sonuçlar derlenerek revize edilen yeni tip projenin autoCAD çizimi görsel olarak içeriğe eklenmiştir. Son kısımda sahada yapılan pilot uygulamadan bahsedilmiştir. Pilot uygulama için, 2019 yılının ilk 8 aylık süresinde 4 kez parafudr arızası yaşayan, arıza uzman ekiplerin ofisine 15 km uzaklıkta, 22 direk tipi trafolu tesisin daha beslendiği hattan beslenen bir abone seçilmiştir. Bu tüketicinin tesisinde meydana gelen parafudr arızalarının şebekeye maliyeti 8 aylık süreçte 74,828.8 Türk lirasıdır. Revize edilen yeni tip projenin tüketici tesisine uygulanması ile parafudr arızalarının sebebiyet verdiği şebeke maliyeti ortadan kaldırılmıştır.en_US
dc.description.abstractIncreasing energy demand with each passing day increases the load and size of electricity networks. Supply companies and consumers are faced with material and moral damages due to electrical failures, which are one of the most undesirable situations in electricity networks. Transformers are added to the distribution lines to meet the energy demands. Distribution transformers that can be installed as a direct type up to 400 kVA are installed especially by high power consumers and by the supply company to meet the needs of LV subscribers. The type projects of the pole type transformer facilities are determined by TEDAŞ and the facility must be built on site in accordance with the type project. In this study, the prevention of the negative effects of surge arrester-induced HV failures on the network was researched by revising the type project of pole type transformer facilities. First of all, technical knowledge of the equipment used in the facility was obtained and their compliance with the relevant regulations and legislation was examined. Ereğli district of Konya province was selected as the study area, where the number of direct-type transformer facilities was recorded as 1952 in 2018 and 2187 in 2019. It has been determined that 10% of the number of permanent HV failures in these facilities in 2018 and 13% in 2019 were surge arrester failures. The increase in the number of facilities with pole type transformers and the increase in the number of surge arresterrelated breakdowns has been associated and transferred. Accrual loss and repair costs arising from surge arrester failures are processed at unit prices and presented in the study. Modeling was done with dpPower and PSS Sincal programs in the network studied. Short circuit analysis, network topology and simulation are included in this modeling. Short circuit analysis was performed and the magnitudes of the short circuit currents occurring in the fault scenarios and at which points the fault current was higher were added with the simulation results. The autoCAD drawing of the new type of project, which was revised by compiling regional data and technical results, was added to the content visually. In the last part, the pilot application in the field was mentioned. For the pilot application, a subscriber that experienced 4 surge arrester failures in the first 8 months of 2019, 15 km away from the fault expert teams' offices, was selected from the line feeding the facility with 22 direct-type transformers. The cost of surge arrester failures in the facility of this consumer to the network is 74,828.8 Turkish lira in 8 months. With the application of the revised new type project to the consumer facility, the network cost caused by surge arrester failures has been eliminated.en_US
dc.identifier.citationKüçüksümbül, İ. (2020). Direk tipi trafo tesisleri için tip proje uygulamalarının geliştirilmesi. (Yayınlanmamış Yüksek Lisans Tezi). Necmettin Erbakan Üniversitesi, Fen Bilimleri Enstitüsü Elektrik-Elektronik Mühendisliği Anabilim Dalı, Konya.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12452/7152
dc.language.isotren_US
dc.publisherNecmettin Erbakan Üniversitesi Fen Bilimleri Enstitüsüen_US
dc.relation.publicationcategoryTezen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectArızaen_US
dc.subjectEnerji Sürekliliğien_US
dc.subjectGüvenliken_US
dc.subjectParafudren_US
dc.subjectTip Projeen_US
dc.subjectTrafoen_US
dc.subjectYüksek Gerilimen_US
dc.subjectFaulten_US
dc.subjectEnergy Continuityen_US
dc.subjectSecurityen_US
dc.subjectSurge Arresteren_US
dc.subjectType Projecten_US
dc.subjectTransformeren_US
dc.subjectHigh Voltageen_US
dc.titleDirek tipi trafo tesisleri için tip proje uygulamalarının geliştirilmesien_US
dc.title.alternativeDevelopment of type project applications for pole type transformer plantsen_US
dc.typeMaster Thesisen_US

Dosyalar

Orijinal paket
Listeleniyor 1 - 1 / 1
Yükleniyor...
Küçük Resim
İsim:
651966.pdf
Boyut:
4.57 MB
Biçim:
Adobe Portable Document Format
Açıklama:
Yüksek Lisans Tezi
Lisans paketi
Listeleniyor 1 - 1 / 1
Küçük Resim Yok
İsim:
license.txt
Boyut:
1.44 KB
Biçim:
Item-specific license agreed upon to submission
Açıklama: